Ledgestone retaining wall repair in Colorado: NFC can either be mixed on-site for smaller areas or purchased from a reputable concrete supplier and trucked in for larger commercial applications. NFC is mixed at a 6:1 ratio by volume of 20mm max size clean aggregate and cement. Water content should be such that the cement slurry evenly coats the aggregate and retains a wet/glossy appearance without excess slurry running off, this is typically around 40 litres per 100kg of cement. With the use of NFC, we are able to build Block Retaining Walls in areas and situations where normal construction methods would not work. Some of these situations are: In areas where excavation behind the wall is limited either due to being on a boundary or close to other structures or footings.
Why you should backfill with stone? Versa-Lok recommends compacting the angular stone as you backfill, but check the installation instructions for the type of block you’re using. Backfill about 8 to 10 inches below the top of the capstones. This will allow enough room for the topsoil and turf. Secure the capstones with a specialty landscape block adhesive, which stays flexible over time. Make sure the blocks are dry before applying the adhesive. Overhang the capstones about 1 to 1-1/2 inch. Joe and Jake use a scrap 2×4 as a guide.
After your drainpipe is in place, you should backfill the rest of the space behind the blocks with either sand or pea gravel—either will allow water to filter through to the drainpipe at the base of the wall. For the best results, backfill with a few inches of the material after laying each course of blocks, and use a hand tamper to compact the material. By tamping the backfill every six inches or so, you’ll ensure that it is packed tightly, which will provide additional support from the pressure of the soil behind the wall.
After mixing your concrete, pour the wall in horizontal layers of not more than 20 inches, beginning at the ends and moving toward the center. Use a ramp to wheel the concrete into position and a splashboard to direct the pour and control spillage. Remove the spacers as you go, and work the concrete against the sides of the form and around the reinforcement as each layer is poured. Pour layers as soon after the previous one as possible to avoid cold (non-bonded) joints, which cause leaks. Strike off the concrete flush with the top of the form, and then trowel it to the desired finish. Insert anchor bolts for mud sills and wooden caps once the concrete has set sufficiently to hold them. Because of the pressure created by the slope of the lawn, cure the concrete for at least seven days before removing the forms. Find extra information at Best Retaining Walls Colorado.
Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery.